—
RCD
↖ INDEX
—
—
Controls
Mode
Assembly
Sequence
Drawing
Section planes
X
0
⇆
Y
0
⇆
Z
0
⇆
Clear cuts
View
Sheet
Text
Dims
Fit
Layers
All on
Framing only
Layers are driven by the build sequence. Switch to Assembly to control them.
Separate
Separate
0"
Isolate
STEP 1
—
—
0
12"
Drag to orbit · two fingers to pan · pinch to zoom · tap any part
Related details
RCD-005
Hip roof framing
24'-0" x 12'-0", equal pitch on four slopes, adjustable 3:12 to 16:12
RCD-006
Shed roof framing
12'-0" LEAN-TO · LEDGER ON AN EXISTING BRICK WALL · 1:12 TO 6:12
RCD-013
Roof sheathing, insulation and covering
6:12 GABLE · 7/16" OSB 24/16 · SHINGLE, METAL, TILE OR SLATE · VENTED OR COMPACT
RCD-014
Asphalt shingle roof covering
GABLE · 2:12 TO 12:12 · THREE-TAB OR LAMINATED · DRIP EDGE, UNDERLAYMENT, STARTER, FIELD, RIDGE
RCD-015
Roof-to-wall intersection
SIDEWALL · STEP FLASHING · COUNTERFLASHING · KICKOUT
RCD-016
Ridge vent and attic ventilation
THE SLOT · THE VENT · AND THE OTHER END OF THE ATTIC
Tools
TOOL
Roofer
Roof assemblies
TOOL
Waller
Assembly & dew point
House Anatomy
↖
All construction details